Jiaxing – Shaoxing River-Crossing Bridge

The total cost of Jiaxing – Shaoxing River-Crossing Bridge construction is 13.9 billion RMB, and investment of bridge part was 6.35 billion RMB. It was completed and ready for traffic in 2012. It is the biggest infrastructure construction project in Shaoxing’s history, and is also another world-class bridge after Hangzhou Bay Bridge in Zhejiang province. As the world-class bridge, Jiaxing-Shaoxing River-Crossing Bridge is difficult construction project with modern design and high technology. Currently this bridge has two world innovations: the longest and widest multispan cable-stayed bridge. Ougan Bi-directional static load test is applied in this bridge successfully, the test pile is with 3.8m diameter and 205000KN load capacity (the biggest capacity of single pile in the world).

1.Jobsite

jobsite - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

 2.Load cell

Load cell 3 - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project
3.Load cell 2

Load cell - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

4. Load cell 3

Load cell 2 - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

5.Pour concrete into load cell 1

Pour concrete into load cell 1 - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

6.Pour concrete into load cell 2

Pour concrete into load cell 2 - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

7. Pour concrete into load cell 3

Pour concrete into load cell 3 - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

8.Weld reinforcement hoop to load cell 1

Weld reinforcement hoop to load cell 1- Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

9. Weld reinforcement hoop to load cell 2

Weld reinforcement hoop to load cell 2 - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

10. Weld load cell to reinforcement cage 1

Weld load cell to reinforcement cage 1- Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

11. Weld load cell to reinforcement cage 2

Weld load cell to reinforcement cage 2 - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

12.Weld load cell to reinforcement cage 3

Weld load cell to reinforcement cage 3 - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

13. Finish welding load cell to reinforcement cage

Finish welding load cell to reinforcement cage - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

14.Strengthen the welding of load cell and reinforcement cage Strengthen the welding of load cell and reinforcement cage - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

15.Weld strain gauge

Weld strain gauge - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

16.Preparation for lowering reinforcement cage

Preparation for lowering reinforcement cage - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

17. Lower reinforcement cage 1

Lower reinforcement cage 1 -Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

18.Lower reinforcement cage 2

Lower reinforcement cage 2 - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

19. Lower reinforcement cage to pile

Lower reinforcement cage to pile - Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project

20.Design sketch of bridge

Design sketch of bridge -Jiaxing - Shaoxing River-Crossing Bridge DuSense LLC Project