We are pleased to announced that DuSense-Ougan team recently completed a BDSLT project at Sabiha Gökcen Airport in Turkey.
The project was completed using Ring Super-Cell BDSLT method to carry out 2 PTP tests with 100 cm diameter, 32-meter length bored test pile, compression test load of 2500 tonnes. All testing went smoothly and efficiently during July-August 2016.
For more information about this project please visit http://dusense.ae/wp-content/uploads/2016/04/DS0003-SC-Case-History-BDSLT-Sabiha-Gokcen-Airport-Turkey.pdf or contact us via email at info@dusense.ae or call us at 00971 4 813 2972.